News & Events

Lower McAlpine Creek Greenway – 1st Concrete Boardwalk in Charlotte
"...Recognizing the need for a durable boardwalk through the floodplain that could meet the 10,000 lb design load, Mecklenburg County chose to use a new local product, PermaTrak. A textured surface was integrated into the boardwalk to improve its slip resistance. Finally, thanks to contractor J.D Goodrum, the elevated greenway connector was opened in November 2012. Greenway enthusiasts from skateboarders to dog walkers were quick to begin using their new elevated greenway connector."

Continue Reading